Friday 6 November 2020

Blasto, Inc., operates several mines. At one, a typical batch of ore run through the plant yields three products: lead, copper, and manganese.

 Blasto, Inc., operates several mines. At one, a typical batch of ore run through the plant yields three products: lead, copper, and manganese. At the split-off point, the intermediate products cannot be sold without further processing. The lead from a typical batch sells for $42,000 after incurring additional processing costs of $11,550. The copper is sold for $90,000 after additional processing costs of $17,500, and the manganese yield sells for $61,000 but requires additional processing costs of $18,950. The joint costs of processing the raw ore, including the cost of mining, are $110,000 per batch.

Required:

Use the estimated net realizable value method to allocate the joint processing costs.



























Thanks

No comments:

Post a Comment