A fixed cost:
Answer
Does not change with changes in the volume of activity within the relevant range.
Requires the future outlay of cash and is relevant for future decision making. |
|
Does not change with changes in the volume of activity within the relevant range. |
|
Is directly traceable to a cost object. |
|
Changes with changes in the volume of activity within the relevant range. |
|
Has already been incurred and cannot be avoided so it is irrelevant for decision making. |
Does not change with changes in the volume of activity within the relevant range.
No comments:
Post a Comment