Saturday 19 May 2012

Matson Company manufactures automobile floor mats. It currently has 2 product lines, the Standard and the Deluxe. Suppose that Matson has conducted further research into its overhead and potential cost drivers. As a result, the company has compiled the following detailed information breaking total overhead into three cost pools


Matson Company manufactures automobile floor mats. It currently has 2 product lines, the Standard and the Deluxe. Suppose that Matson has conducted further research into its overhead and potential cost drivers. As a result, the company has compiled the following detailed information breaking total overhead into three cost pools
 
  Activity Pools
Cost Driver
Cost
Assigned
to Pool
Quantity/Amount
Consumed by
Standard Floor Mat Line
Quantity/Amount
Consumed by
Deluxe Floor Mat Line
  Material Handling
# moves

$
2,376

46 moves
62 moves
  Quality Control
# inspections

$
9,100

700 inspections
700 inspections
  Machine Maintenance
# machine hrs

$
14,240

2,990 machine hours
4,130 machine hours
Requirement 1:

Calculate the activity rates for each cost pool assuming Matson uses an ABC system. (Round your answers to 2 decimal places. Omit the "$" sign in your response.)










 

  Activity rate


  Material Handling
$ 22 correct
 per material move

  Quality Control
$ 6.5 correct
 per inspection

  Maintenance
$ 2 correct
 per machine hour




Explanation:
Material Handling:  $2,376 / 108 = $22/move
Quality Control: $9,100 / 1,400 = $6.5/inspection
Maintenance:  $14,240 / 7,120 = $2/machine hr.

Requirement 2:
Calculate the amount of overhead that Matson will assign to the standard floor mat line. (Round your intermediate calculations to 2 decimal places and final answers to the nearest whole dollar amount. Omit the "$" sign in your response.)
 
  Total overhead assigned
$ 11,542 correct  
 Explanation:

Activity Rate
Activity Requirement
(Standard Mat)
Total Cost
Assigned
  Materials Hand
$22 per move
46 moves

$
1,012  

  Quality Control
$6.5 per inspection
700 inspections


4,550  

  Machine Maintenance
$2 per machine hour
2,990 machine hours


5,980  










     Total Cost Assigned



$
11,542  















Requirement 3:
Determine the amount of overhead Matson will assign to the deluxe product line. (Round your intermediate calculations to 2 decimal places and final answers to the nearest whole dollar amount. Omit the "$" sign in your response.)
 
  Total overhead assigned
$ 14,174 correct  
Explanation:

Activity Rate
Activity Requirement
(Deluxe Mat)
Total Cost
Assigned
  Materials Hand
$22 per move
62 moves

$
1,364  

  Quality Control
$6.5 per inspection
700 inspections


4,550  

  Machine Maintenance
$2 per machine hour
4,130 machine hours


8,260  










     Total Cost Assigned



$
14,174  


No comments:

Post a Comment