Pages

Tuesday, 6 August 2013

A fixed cost: Requires the future outlay of cash and is relevant for future decision making. Does not change with changes in the volume of activity within the relevant range. Is directly traceable to a cost object. Changes with changes in the volume of activity within the relevant range. Has already been incurred and cannot be avoided so it is irrelevant for decision making.

A fixed cost:
Requires the future outlay of cash and is relevant for future decision making.
Does not change with changes in the volume of activity within the relevant range.
Is directly traceable to a cost object.
Changes with changes in the volume of activity within the relevant range.
Has already been incurred and cannot be avoided so it is irrelevant for decision making.
Answer
Does not change with changes in the volume of activity within the relevant range.

No comments:

Post a Comment